Sunday 30 December 2012

Building Stagnation




Saturday 15 Dec 2012
All this time there’s been no action on the building site whatsoever.  Constantine is trying to finalise the accounts for the work to date and we are waiting impatiently to know whether there is enough cash left in the pot to get the rafters on.  We’ve had some lovely sunny days and Dave has started sanding the rough wood and spraying a preservative against termites and mould.  But he needs at least two days of dry weather before the wood is able to be worked on, so the job is very intermittent.  We are getting more and more anxious to get some sort of roof covering on, to protect the wood already installed, as the lovely yellow pine is getting black streaks from the damp.  But no sign from Constantine.

We had errands in Lefkas town so we took Sid for a romp on Windmill beach, north of the town.  Sid loves a swim. 




No comments:

Post a Comment