Rowan has found some time to come and finish the deck terrace outside the house. The deck covers three water tanks, and so far we've had no access to their lids for checking and cleaning.
Rowan has found some time to come and finish the deck terrace outside the house. The deck covers three water tanks, and so far we've had no access to their lids for checking and cleaning.
Rowan started by taking up four of the boards to measure. The under frame for the hatches was already there, as the hatches had always been in the spec.
Measuring and framing
The finished job. Incredibly neat, and looking like a bit of fancy patterning, rather than a series of inspection hatches.