Thursday 28 May 2020

Finishing the deck

23 - 24 May 2020

Rowan has found some time to come and finish the deck terrace outside the house.  The deck covers three water tanks, and so far we've had no access to their lids for checking and cleaning.

 Rowan started by taking up four of the boards to measure.  The under frame for the hatches was already there, as the hatches had always been in the spec.

 Measuring and framing

 The finished job.  Incredibly neat, and looking like a bit of fancy patterning, rather than a series of inspection hatches.


No comments:

Post a Comment