All four ceiling panels are now painted and installed, even the tricky one with all the electrics running through it, which required an extra plywood box. The final panel has to wait until the end wall has been built, as we will fit it to the wall.
All four ceiling panels are now painted and installed, even the tricky one with all the electrics running through it, which required an extra plywood box. The final panel has to wait until the end wall has been built, as we will fit it to the wall.
So now it's time to start tiling the shower - using the fancy laser level again ...
... which is my job, as Dave finds it too fiddly. He prefers to fix the big strimmer and go shave some land.