Friday 27 February 2015

Itty Bitty Bathroom wall

2 Feb 2015

So, now it's time to start constructing the bathroom so we can have a house (building site) party for Dave's 60th in March.  First step - extend the wall on the right hand side, up to the point where it will turn the corner to create a corridor to the music room.

This is our clever little 'Cubix' laser level, establishing the centre line of the wall up to the music room door.  At this point, we're just going to build a little wall to the left of the yellow cube, to extend the existing wall to where it will turn the corner.


And here's that wall, later the same day (bathroom interior above, living room side below) - with plasterboard for tiling round the bath, some laths in place and insulation throughout.



No comments:

Post a Comment