Wednesday 13 February 2019

Mezzanine batons

7 - 9 Feb 2019

Now we have the fiddly bits of the curving mezzanine.  Full of wires, and over rough ground with lots of obstacles for the ladders.

 Thursday, getting started.  First fix of silly little pieces in the left end, then working along cutting batons for each space, with channels for the wires.

 Dave doing the chiselling out.  After a while he changed to using the jigsaw, which was a little easier and quicker.

 Friday, moving along.

 Catching the dog just as she wins the tail-chasing game - which is an added menace (for her and us) around the whole ladders-and-power-tools setup.

Saturday, all long batons cut and fitted.  Cross pieces next, then panels.

No comments:

Post a Comment