1 March 2015
Finally, the new bathroom floor was dry enough to lay boards and get on with building the internal wall.
Finally, the new bathroom floor was dry enough to lay boards and get on with building the internal wall.
Using the laser level to position the horizontal piece
Putting in uprights
Plasterboard for the interior surface as it will be mostly behind the bath
From the inside, plasterboard to dado height, only the corner to construct now. I want to do this like the practice one in the studio - a right angle inside the room (for the bath to fit) and a curved outside.
No comments:
Post a Comment