Going Up



Friday 28 September 2012

0800 the following morning, the workforce arrived as we crawled blearily out of bed, and within 30 mins we had our first upright as the flatpacked house started to unfold. 



Constantine arrived with our RealArchitects t-shirts, which we put on immediately as it meant we didn’t have to think about what to wear.


This is the back, proving they are of-fish-ial t-shirts!


Then we went into Nidri to wave Rob off on his travels.




We were back on the land at one-ish, and this much structure had appeared.  The workers left around two, so Dave and I marked in the critical locations for uprights through the middle of the house, and then Dave got on with drainage trench digging.  Not bad for a rockstar with a hangover.