Sunday 28 October 2012

Winter prep



Friday 26 October 2012


Amazing photo appeared on my camera.  Talk about a lucky shot.  Still, looks like the rainy season is settling in, so we’ve been taking precautions.  Finally I have a nearly full load of logs in my little woodstore.  I’d feel happier if we had at least three times as much ready and dry, but I’ll have to make more woodstores to do that.


And I decided to try to protect more of the decking this winter.  It’s not easy to keep anything dry, but a polythene wall will help to stop rain driving in under the awning from the south.  I think it’s a success, because I’ve found both the cats and the chickens checking out the new sheltered corner.



Sunday 28 October is 'Oxi Day' - celebrating Greece's entry into the second world war when the prime minister said 'Oxi' - NO! to Mussolini's request to station troops on Greek soil.  We're in Cafe di Paris, keeping an eye on the weather which is blowing a bit, and the flags are out and the school children are parading.


Structure update



Friday 26 October 2012


So here’s where we are in the build for the moment.   It hasn’t progressed very fast because Yiannis the woodworker had a Christening to go to in Athens, so he took off on Wednesday 10th and didn’t get back until Monday 22nd.  I think Constantine put him on another job for a few days.  He was back, with Rap, his sidekick, on Monday 22nd and the mezzanine rafters started to go up.  By Friday the workers had disappeared again, and the rains came back.  So we have most of the upper floor bolted in, and the batons at the east end show the roof height and slope.




  The aloe vera is doing well as the only planting so far in the terraced indigenous plants and potential bee and butterfly garden.  I haven’t been doing much wall building because the wood deliveries are barring easy access for heavy stones. 

  This is the entry room of the house – with a window facing the camera and the front door just to the right of it.  This room will house the battery banks and inverters as well as coats and boots and things.

This is the main seating area of the house – it will have an alcove through the wood frame out to the curve of the cob.   Although the workers removed the diagonal bracing, they missed the point rather when putting in the cross-piece: it’s so high off the proposed floor level that you sit on it with tip toes only touching the ground.  Dave reckons we can lower this when we’re left to our own devices on site.

This is as far as my wall goes.  The steps turn the corner to the left and go up to the first level, and I’ve done some of the tricky corner.  I’m looking forward to getting on with this when the woodwork is finished.

 This is Dave’s drainage ditch so far, looking along the north wall which is the back of the bedroom.  All dug, pipes laid, and refilled with clean gravel, nearly half done.  All summer, working on the yacht turnaround, there have been a few reject sheets each Sunday (stained or battered and not up to standard for a charter yacht), so I have quite a collection.  Luckily, it turns out,  as we have been using them as a membrane between the soil and the clean gravel.  The membrane doesn’t have to be too robust, it just prevents silting in the gravel.

 Interior wall, looking down the corridor-to-be towards the bedroom door.   Showing the dropped mezzanine floor level.  The bedroom walls aren’t built yet, as they are affected by the roof slope, so once that’s in, they can be measured to height.

Extent of the mezzanine.  Constantine said they’d put the joists in as long as they can go (because of the cantilevering), and then we can decide how far we want them to come out over the living space.  The mezzanine ceiling is deliberately low, to keep the whole house profile low.   The low ceiling is only over the bathroom, corridor, music alcove, pantry, and a part of the kitchen, so hopefully it won’t feel too cramped.  We have high sloping ceilings in the living and bedrooms.

Toad in the hole



Tuesday 23 October 2012

I was scrabbling about in the ground around the utility room, looking for the foundation edges to measure for our change in plan, when I saw this lady, all dressed up in army camouflage gear.  We looked her up, and she is a Common Green Toad, a very boring name for a fabulous creature.