Monday, 29 October 2018

All things windows

17-19 October 2018

While we were working on the bedroom, and Jade continued prepping the Solar, Rowan finally got round to fixing in the last of our windows.  We'd had the glassed and painted frames sitting in a pile in various places for months, moving them around to protect them whenever the work swung round to their latest location.  So it was a joy to find they were, all of a sudden, installed!

 The little masked window on the right, newly installed - picture shows the stuff moved out of the bedroom and not yet replaced, cluttering up the studio.

 The other studio window - which has been a polythene sheet for a very long time

 Then over the next two days, Rowan cut and fitted arched trims in the 'Cathedral' window, to match the window shapes.  The one on the left is done, the middle and right hand ones show the insulation crammed into the corners.

 Rowan at work, with monster nail gun, managing to avoid our wildly enthusiastic spider plant

 A lovely job done on the 'Georgian' window, trimmed all round.

And the little arched window, also finished off and ready to paint.

No comments:

Post a Comment