Thursday 30 August 2018

Streamlining the process

Weds 1 August 2018

The Music Room ceiling insulation is the next job, so we took measurements, Dave working his way round the room on a ladder, me sitting with my feet up making notes!  The width measurements were more regular than we'd found on the other side of the ridge beam, in the living room, and we are not constrained by the 'A' frame cross-bracing to make each one an exact fit, so we arrived at a working average that should fit every aperture.

This means that we could order 18 boards all the same length and width, and Dave could drill and sand them in batches, streamlining the preparation process.





No comments:

Post a Comment