Tuesday 26 June 2018

Lots of wood arrives

5 June 2018

The delivery of batons and laser-cut plywood panels finally arrives.  Now work can start on the main ceiling.

 Somewhere to stack the plywood - batons stuck into breeze-blocks.  We had the delivery driver offload our supplies into the garden, so we could sort the panels by width (almost every gap between rafters is different sized to the others, so each has been measured individually).  We stacked in reverse order, so the pile will reduce as we work across the room towards it.  Then we brought the five metre batons in through the window.

Done!  Quite a job, and a bit of an obstacle course now to reach our tea-break chairs.

No comments:

Post a Comment