3 Feb 2018
In the on-going saga of getting the new electrics established, Tomas was finally able to return and fix the final connection between the panels and the system. We had Mark from Off-Grid Europe on the phone, and we were ready to throw the switches. But when Mark said, 'plug wire A into socket B' we found there was no socket B. Mark thought the system had been supplied without a crucial little component. He would have to order it and get it expressed to us from Germany. Back to the long wait.
But at least Tomas was able to fit more wall lights and drop off our handsome new standard lamp.
In the on-going saga of getting the new electrics established, Tomas was finally able to return and fix the final connection between the panels and the system. We had Mark from Off-Grid Europe on the phone, and we were ready to throw the switches. But when Mark said, 'plug wire A into socket B' we found there was no socket B. Mark thought the system had been supplied without a crucial little component. He would have to order it and get it expressed to us from Germany. Back to the long wait.
The system, with the batteries pulled out so we can get at the back to turn on and plug in cables, etc. Lots of fiddling about, but no results. Much sorrow.
No comments:
Post a Comment