4 - 9 December 2016
Hurrah! Rowan has managed to finish the front door and all the downstairs casements before leaving for his annual break in the UK.
Hurrah! Rowan has managed to finish the front door and all the downstairs casements before leaving for his annual break in the UK.
Rowan arrives with the new front door, and sets about installing it
The windows, ready for fitting. We took measurements and shot off to the glassworks to get the panes made asap
Front door installed, with sheet pinned up until the glass arrives. I made an effort to get the door glass prioritised, but put so much attention into getting the millimetres right that I got the tens wrong and they were 10 centimetres too narrow, and we had to get a second set made.
The new windows, installed but needing a good clean
Zoom in on the cat, realising that everything has changed ...
No comments:
Post a Comment