28-29 Dec 2015

Plastering again - wet weather is expected at the end of the week, so time to press on with the second coat around the front door.

 Monday - top left corner from the scaffolding.  Crouched under the cross-beams to reach up under the eaves.  See the darker line of wet plaster halfway along the window.

Tuesday - long session, 3 barrow-loads, all the areas reachable from ground level done.