21/22 October 2014
After a rainy (and increasingly cold) Monday, (which gave us the chance to go for window panes), Rowan and Paris were back on Tuesday and rainy Wednesday.
Rowan installed the rest of the pillars and finished the 'box girder' structure. It is definitely over-spec'd for what is needed. Note to self.
After a rainy (and increasingly cold) Monday, (which gave us the chance to go for window panes), Rowan and Paris were back on Tuesday and rainy Wednesday.
Rowan installed the rest of the pillars and finished the 'box girder' structure. It is definitely over-spec'd for what is needed. Note to self.
With bad weather expected, we had to wrap the east face again, if only roughly, and Dave fitted window panes.
Wednesday was drizzling, so we decided to try plastering through it. Only problem was the rain that got into the mix while mixing, we had some very sloppy plaster on Wednesday! But look at the glass in those windows - how posh is that?
Paris on the straw-bale scaffolding, still stuffing dollies, but making her own laths by now.
I'm still on the high wire, lathing and then plastering these high level sections in the top corner