Plastering

Thursday 24 April 2014

And even more of the same.  Dave now at the top of the scaffolding, able to do about a metre square each day, then wait three hours for it to be ready for sponging, then move the scaffolding for the next patch next day.  It's far too much hassle to move the scaffolding on, then back, for each section - lots of time goes into levelling and stabilising and it needs both of us.

My patch is coming along nicely, if not very quickly:

 Door area fully lathed.

Wall by stairs partly lathed and insulation starting to be installed.  We're using a polyester insulation, not cheap, but eco-friendly and nice to handle.