Tuesday, 25 June 2013

A Moving Experience

Wednesday 12 June 2013

At long last, some progress was made at moving the Winnebago off the land.  Some progress, at least.  Alison, Michael and the kids arrived, with a bottle of wine for us, a can of fuel for the Winni and determination.  After a quick stiffener, we all went to watch Michael give it a go.  During the proceedings Lin and Pete from up the hill came by to borrow the car, and helped watch.

Impressively, after two years in a field, she started up first time.  Michael disconnected all the services and the show began!


 Some serious watching going on: Lin, Alison and Dave


 First move: forward between the spindly trees of our attempt orchard


 Calculating the risk factor (to the trees)


 How those trees survived, I'll never know!


Half off the track, one more reverse before achieving escape trajectory


This is where we all yelled 'stopppp!' as crunching sounds were heard


Oops!  Where did that tree come from?  


Chainsaw remedy.  Pity, I liked that tree.
 

It gave as good as it got, however.


The watchers were largely unimpressed
 

Not quite round far enough, one more shuffle ...


 ... and the engine cut out.
 

Alison went for more fuel, but it turned out it wasn't that, but some electrical fault.  So the family retired in defeat for today, promising to return tomorrow with Andy who's good with electrics - leaving us just enough room to squeeze a car through the gap.

Boatyard

To Tuesday 11 June 2013

We spent long hours in the boatyard, Dave doing the exciting maintenance stuff, while I cleaned, polished and antifouled.  We found the toilet holding tank had developed pinholes last season, which accounted for a certain aroma on board, so we threw out the old steel tank and installed a new one, which required a bit of 'wood-butchery' as Dave describes my carpentry, to build it into the heads.

Entirely by accident, I wore an old t-shirt of Dave's that has stretched too much, as a cover-up for antifouling - and then realised just how appropriate it was ... !


Here she is, all sparkly ready to go back in the water, and below, the tractor manoeuvring into position for launching.
 


Wildlife

Early June

It is spider season again.  They come out in June and lay traps for the unwary across paths, where the bushes are just nicely spaced apart.  Given how many flying creatures we are pestered by, who's to complain?  We just hope not to walk into a web by accident!



One of the few flying creatures we're pleased to see are the swallowtails.  Here I managed to almost get a good shot of one at rest - they don't stay still for long.


Then there's this fellow - mysteriously appeared on the boat.  I shooed him out.


Saturday, 1 June 2013

First steps

May 2013

While Dave is nailing floorboards, I'm getting on with the wall, and have made it round the bend to the south wall.  This area is planned to be indoors - behind glass for passive solar heating in the winter, so the stem wall can be a lot lower, as we want to maximise the amount of cob wall here.  It's great, I've galloped along the front with only two courses of stone to lay.  By the 26th I've reached the door, and decided to make a couple of steps at the threshold, to drop down to a lower floor level in the trombe wall / mini-conservatory area.  As the wall is 60 cm (two foot) wide, I can make two 30 cm steps within the wall thickness, using a few of the floor slabs otherwise destined for the bathroom.  Here's the first step completed, and the top one under construction.


And this, below, is my trusty 'sack-barra' (or sack-barrow as someone more southern might say) for moving those inconveniently large rocks.  The uneven ground makes it a bit of a challenge, but between us, me and the barra are shifting those stones into place.


On Thursday 23th, we gathered for Art as we usually do, at Mamma Mia in the morning.  Spiros had arranged a priest to stop by to give the restaurant a blessing to freshen up the space and get rid of any negative energies.  Jessica, Amanda and I stopped to watch as he made Holy Water, and splashed it into the corners.  After he'd left, Spiros bottled up the water, and gave us each a little bottle to take home and do our own spaces.  I wanted a photo of the priest in full regalia, but didn't want to be too touristy, so he'd taken off his gold front before I managed this shot.


 Then on Tuesday 28th, we decided that we couldn't leave the boat any longer, if we didn't get it in the yard for maintenance it would be unfit for use in the summer, and if we left it any later, it would be impossible to work in the heat.  So out she came, with maybe two weeks work to do before we can get back to full time building the house.


Thursday, 30 May 2013

Going Up

May 2013

Finally, after weeks of asking, we had a delivery of floorboards for the mezzanine.  They turned out to be more expensive than we'd hoped, but also a lot more posh than we'd expected.  We were just going to fit the basic stuff we'd put in the shed, but Constantine didn't want to compromise his professional integrity, and got us the posh stuff at a very good price comparatively.  So we're not complaining, and Dave was able to throw himself into woodworking, since he'd been invalided out of wall building.

16th May: The first few boards fitted, enough to be able to work from on top, rather than running up and down various ladders to nail onto each joist.
 17th: Almost to the central beam.
18th: Fitting round the posts.  The mezzanine starting to look like a really nice upstairs space
Doing the boards over the entryway, Dave found this creature hanging onto a joist.  We called her 'Lucky' as you don't get to be that big a stick insect without a bit of luck.  She stayed put, just shuffling round a bit, while we nailed the boards down over her head.  The joist she's hanging on to is 12cm wide.
27th: Dave has managed the tricky bit around the stair aperture, and got a few boards down on the cantilevered section of the mezzanine - here he demonstrates that they can hold his weight, and there's plenty of headroom.  In fact, there's lots more headroom than we planned - it's a lot bigger all round than we expected.
Walking the plank - well, shuffling along on your bottom on the plank.  Neither of us are very good with heights.
Westering sun streaming into the boarded out mezzanine, with the mattress we bought from Joe and Amanda ready and waiting.  The wood ust needs to be treated with preservative and we'll be moving in.  Doesn't it look nice?

Entertaining!

May 2013

On Thurs, May 2nd, after a morning at Art, I returned home to find we had visitors, Naomi and Pete with their friend Gary, had turned up.  Naomi was keen to provide a day or two's labour as a wedding present - which was a lovely thought, but Thursdays are Art in the morning for me, and Band Practice in the evening for Dave, so it was impractical that day.

I arranged a little meze for lunch, and we had our first communal meal in the house!
A week later, the afternoons are warm, and the sun shines enough to provide electricity for various amps, so band practice moved to the living room of the house.  Another acquisition from Joe and Amanda is a second fridge, which now lives in the 'kitchen' of the building site, filled with beers, and only turned on on Thursday mornings ready for practice.
On Saturday, May 11th, Naomi did come back and put in a long hard day's labour on the site.  Dave had been called away to do boaty things, so I was extra grateful for the company.
5pm, lots achieved, Dave home - time for a little meze and a glass of something.
Thurs 16th, and we had a surprise turnout for band practice - which was more of a jam session with so many musicians in one place - seven in total!  Guitars, bass, drums and mouth organ, lots of bluesy riffs rolling across the olive groves.  Lucky we have no close neighbours, although painting Amanda down the hill said she enjoyed the music while gardening.
Traffic chaos on the track!

Rock on!

May 2013

Sorry for the long gap between posts.  I've barely had the computer on this month.  We've been working hard on the house whenever we can, with Dave's boats in the yard to be launched and made ready for summer visitors, work on Sundays and frequent visits to the dentist (I went for a checkup and found I needed eight! old fillings replaced - eugh!) all intruding on our time.

On Tuesday 30 April, Dave was working on getting the borrowed mixer going, it was firing up, but not starting, when Pete came round, and said, 'are you sure the string goes that way round the pull cord mechanism?'  After that, it started chugging away like a dream.  
We did a few mixes, and rapidly ran out of supplies, so on Thurs 2nd, this delivery arrived.  Three bags of sand, one big sack of 40 smaller bags of lime and a stack of floor slabs, ready for the bathroom.  Luckily a plumber friend, Simon, came round on a different errand, and said, 'don't lay the floor till the water pipes are in.'  We made arrangements to do this in June, finances allowing. 

These are all wedding presents: sand, lime and slabs - very many thanks to you all x x x

This is our masonry work zone.  At this stage the wall looks like just a scruffy lump of stone ...
 ... but by Weds 8th, it has begun to take form. Unfortunately, Dave had pulled something in his back, being too enthusiastic, and was off the strength.  Much to his frustration.  So progress slowed up again, with just me pottering along.  But the mixer is a godsend.
This is where I started to go round the bend ... !  (Whadderyamean 'started'?)  The big umbrella just visible in the foreground is one more thing that we bought at knock-down price from Joe and Amanda as they divest themselves of everything before relocating to NZ.  It's  got a great concrete base, so it's a devil to move around, but it does let me keep myself and the wall in shade as I work.
Here I am, getting my rocks on, with Naomi on a visit, being a great help collecting infill stones and landscaping the piles of earth around Dave's ditch to improve wheelbarrow access.  I'm struggling to find gloves that can cope with sharp sand, big rocks and caustic lime.  One pair were so unsuitable I got cuts in four finger ends, and my skin dried up like lizard hide.  I spent three days applying hand cream at hourly intervals, and wearing plasters on each fingertip. 

Tuesday, 30 April 2013

All mixed up

Saturday 27 April 2013

We had asked everywhere about a cement mixer, but the second hand one we looked at had water in the engine, but we were amazed when Robert Tatos, at a local hardware shop, just suggested he lend one to us.  It needed a bit of attention, but apparently only a pull cord, so we agreed enthusiastically, and he put it in the back of his pick-up and brought it up to Goat Bottom.  Dave was away skippering for the next two days, so I was hoping it could be operational for the morning.  But it just wouldn't start.  In the end, it got dark and we had to accept that I would be mixing by hand again.



Boat launching

Friday 26 April 2013

We had a boaty week.  First off, a trip to Meganissey planned for some time came off this week, so we took a holiday and went sailing.  Then the remaining two boats in the yard were launched, but the water was so low, they got stuck.  Here's Dave trying to get a boat off the submerged sled, with two boatyard lads pushing at the front and a friend in a rib pulling from the end.


Mixing Misery

Mid April 2013

So we're geared up for doing the wall, Dave making mixes, and me laying stone; but it's torturously slow.  We really do need a mortar mixer.  We've been having a look round.  New ones are at least 350 euros.  We'd like an electric one, but we have to be sure it will work with our photovoltaic system, and it's not easy to find out the spec at the agricultural shops.  So we keep looking and asking, and mixing by hand.