Friday, 31 May 2019

Terrace post bases

17 May 2019

While the limecrete slab in front of the stove is given drying time, work started on the footing for the terrace outside the kitchen door.  Pits and wooden frames were made for four small concrete bases.



No comments:

Post a Comment