24 April 2017
With all the uprights in position, we lashed a grid of cross-pieces overhead to hold up the roof wire (using 10mm bar). Then we lashed the door and frame into the structure, fixing it with the metal strip full of holes for screwing pipes to wood. Then the fun started: getting the chicken wire on top and lashing it to the structure.
With all the uprights in position, we lashed a grid of cross-pieces overhead to hold up the roof wire (using 10mm bar). Then we lashed the door and frame into the structure, fixing it with the metal strip full of holes for screwing pipes to wood. Then the fun started: getting the chicken wire on top and lashing it to the structure.
No comments:
Post a Comment