21 - 24 April 2017
More of the same, days of it, surprisingly. The ground is very dry and hard, and full of stones, so trying to keep the uprights upright was quite a challenge - and one we failed, mostly.
Dave knocked in about 18 base supports (1.5m x 16mm: short and strong enough to get a lump hammer to) leaving 80-90 cm above ground, and then we wire-lashed taller, thinner bars to those (2m x 12mm). In our tea breaks (frequent) I stripped the old polythene off the temporary door and frame we used before the front door came.
More of the same, days of it, surprisingly. The ground is very dry and hard, and full of stones, so trying to keep the uprights upright was quite a challenge - and one we failed, mostly.
Dave knocked in about 18 base supports (1.5m x 16mm: short and strong enough to get a lump hammer to) leaving 80-90 cm above ground, and then we wire-lashed taller, thinner bars to those (2m x 12mm). In our tea breaks (frequent) I stripped the old polythene off the temporary door and frame we used before the front door came.
No comments:
Post a Comment