28 June 2014
It was Saturday and we like to take it easy on Saturday so we start Nisos work on Sunday with some energy, but the almost ready kitchen was demanding attention, so we didn't stop - worktops and wiring and moving in the fridge and - most critically - the kettle!
It was Saturday and we like to take it easy on Saturday so we start Nisos work on Sunday with some energy, but the almost ready kitchen was demanding attention, so we didn't stop - worktops and wiring and moving in the fridge and - most critically - the kettle!
Rowan was constructing the kitchen door - insulated as it will be an external door
And here it is - the first reasonable working kitchen I've had since 2011
The fridge, kettle and other electrics from the opposite direction
And this, our latest pressie from my Mum - a Lakeland 'Remoska' - which is a tiny worktop oven (not a slow cooker) that only takes 400W electricity, and therefore can be run off our solar panels. We're very impressed with it.
Still quite a bit to do, especially in moving the straw bales back and using spare plasterboard to act as a temporary wall between the bale storage and the kitchen, but Dave is away skippering and I've got an uncomfortable tennis elbow from too much electric drilling, so I'm taking it easy for the next week.