Friday 10 December 2010

Interior

Thursday 9 December 2010

We were drinking draught Alfa beer in Lefkas the night before, and despite not having much we felt a bit poisoned in the morning with banging headaches (preservatives, probably) and didn't fancy another day on the roof just yet. 




 

So Dave devised ventilation screens for the eaves, while I painted behind the shower with wood stain, and then we cut and fitted the first sheet of plasterboard.

Bill called by quickly to deliver the door frame - we're very impressed, it fits perfectly.  Initially we thought the latch was on the wrong way round, but then worked out we were trying the door upside down!

 
Oh, and this fellow turned up again.  He's about four inches long, and very curious.  I made him pose for photos before encouraging him to go eat aphids down the field.

No comments:

Post a Comment