Tuesday 27 September 2016

Going Strong

26 - 27 September 2016

 Beso is nearly all the way round the house with the first coat.

 Lathing has reached this corner by the entry, one of the last wall sections to be built

 Tuesday 27th, lunchtime.  The tall panel to the right of the middle door is finally done and the top right sections of the (no longer) bare bales behind the scaffolding.  We've had many months of looking at those and wanting to see them covered up.

Tuesday 27th, teatime.  All the wall on the left, below the ringbeam, is done, and one of the sections to the right of the entry door too.  Moving on.

No comments:

Post a Comment