Monday, 28 September 2015

Over the top

Monday 31 August 2015

Back to work with a vengeance.  This is the best building season of the year, time to make hay (!) after months of silly temperatures.  To get the final bale wall up we have to: make the wooden infrastructure; get the bales; install the bales.  So first, we started on the infrastructure.

Dave constructed a lintel frame to span the front door.  The walls curve in towards the door, so the frame is a strange shape.  It needs to hold straw so Dave also made a plywood base, I varnished it, and then we installed it.





No comments:

Post a Comment