Tuesday, 22 October 2019

Visit to Vonitsa

16 October 2019

We have been recommended to an eye doctor in Vonitsa, about an hour away, for our regular check-ups and eye tests, so we made an outing of it, and went to explore the castle.




Exotic critters

16 Oct 2019

It must be the season for weird and wonderful praying mantids.

  Can you see it among the twigs?

 Much easier to spot, on the wall of the house.

And this is our goji berry harvest (and a strawberry).  Better than last year's total of two berries.  More are coming each day.

Saving our Soil

15 - 17 October 2019

Having cleared the ground as much as possible, we turned to the area that we want to make into a pond.  The next task was to clear away the old wooden edging boards and shovel up any usable top soil.

 Actually, the first task was to do what Dave calls my 'invisible mending' on this pair of boots, to stop the sole flopping open and tripping me up.

 This is the area for the pond, four beds still remaining.  Dave got hold of the camera, and for once, captured some pics of me at work, clearing the rotten edging strips away.



 


It is so hot and humid - much more so than is usual at this time of year - we were taking turns doing a job, then sitting out in the shade with water and a towel.
 
 One of the beds being stripped of its topsoil.  The ground is still so hard and dry it had to be broken up with a mattock before we could shovel it.

 We decided to place the ready-to-use raised bed frame up in the moringa beds, where there should be no disruption with heavy machinery (fingers crossed), and barrowed up the topsoil to fill it.  Some of the beds are so overgrown with spreading weeds and couch grass that the soil can't be retrieved, but we filled this bed, and then I built another one quickly from decking offcuts and we filled that too.

 We have put the new beds on top of the small berms in the moringa beds, on the grounds that if we try growing some winter veg, we can then remove the beds and spread the soil out on the berms below after harvest.  Dave has christened this the 'Hodge Method'.

Preparing the ground

11 September 2019


Having returned from our two-week tour of Egypt, we slept for a couple of days, and then threw ourselves into preparing the garden for some 'hard landscaping'.  This essentially means we get a digger in to do a bit of reconstruction, ideally without trashing any of our trees or existing infrastructure.

We have decided to put a large wildlife pond in the space where we have serially failed to grow very much - the six beds at the bottom of the hill.  It is the flattest area we have, and six beds of one metre by four gives  us around four by eight metres, including spaces between beds. 

So Dave started by strimming all the long grass, so we could see what we were doing.


 This shows the edge of the beds that have never done very well, now sadly overgrown.  There is also an unused raised bed, that I made to get some decent wood used up and out of the house before the floor went in.  

 Tackling some very overgrown areas.

 While I disentangled all the growth in the mobile chicken netting, and rolled it away neatly for another time.

 While we were away, Rowan and Paris stayed in the house to look after it for us, and Rowan got on with more of the terrace, putting in these lovely steps to the south.

 This is the area I cut and cleared.  It is the bank below the house, and was full of building rubble, branches, irrigation pipes and very overgrown.  The flourishing plant at the top left of the photo is my prized comfrey, which grows wild in the UK but needs to be positioned on top of our grey water outlet to survive our summer.

Further along the bank to the right, behind the mixer, there is a lot of lime overflow from cleaning out the mixer.  This will have to be dug out.

Egypt

9 October 2011

26 September to 9 October 2019, we had a 12-day tour of Egypt, from the pyramids at Saqqara and Giza to Aswan and Abu Simbel, then Luxor and the Valley of the Kings, Abydos, Dendera, and back to Cairo.  A fabulous trip, partly with a group and partly tailor-made extra tours just for us.  We scrambled inside pyramids, and through a tiny doorway into a crypt; ascended in a hot air balloon, and spent the night on the Nile in a felucca; we travelled on the sleeper train with all its idiosyncracies, and stayed in five-star hotels with wonderful staff.  It was a very wonderful experience.  We travelled with Encounters Travel and would recommend them to anyone.  But this is not what this blog is about, so this is merely a placeholder, to explain the missing weeks.

Tuesday, 24 September 2019

Playing nice together

19 September 2019

During a week of beach visits, pool lazing and eating out, we found time to have a barbeque at the house.  Rob invited a few friends and he and Dave got to play a few numbers on the new terrace - with special accompaniment on the ukulele!




New lights, new deck

14 - 16 September 2019

Rowan came and worked late on the deck a couple of evenings, aware that we needed it child-safe by the weekend.


 The electrician turned up - about three months after my text message asking him to pop in when he could - to fit the lights in the solarium, a power lead to the solar water heater for back-up hot water, and an outside socket for power at the shed.  Lots of good things to have finally sorted.

Another good thing to have finally done: a nice piece of old shower curtain strung across under the sink to make the kitchen look a bit tidier.


 
 The terrace in a state of incompleteness as we left for the airport to pick up the family ...

 ... and how we found it when we returned (which was after dark, so the photos are from the next morning).  Not finished, but temp fixed for safety.


Close up, it clearly needs a trim to finish off, but looking very nice from down the slope.


Baby seemed very happy with the new floor
 

New tanks, new steps

11 - 13 September 2019

We ordered two big (2,000 litre) tanks for rainwater collection off the north face of the roof, and were very surprised to come back from Lefkada one day to find them installed.  Very neat.

While out, we picked up our child-safety haul from the post office: stair gate, high chair, and car seat.  Phew!  We're going to need a lot of grandchildren to visit to justify this lot.

 The two big tanks in position - we've no idea how easy or difficult this was to achieve, as we were out when they arrived.  Lucky that this was where we wanted them, actually!

 Work on the top terrace continues.

 We clear away the overgrown, exhausted tomato plants, and put in some winter cabbages.  The clearance means that the self-seeded rocket can thrive, so salads will be enhanced now.

 The top terrace, and skeleton step are constructed.  

We decide to build the kitchen door steps out of brick, to be clad in stone to match the house.  When I was building the masonry wall around the house, we expected to continue on round the proposed utility room foundation.  Then we found out the utility room hadn't been included in the permit, and that the area was so nice in the morning sun in winter that we preferred a terrace.  However, the wall was left in a way to make it easy to continue with stone, and it has looked ugly ever since.  This is the chance to make it all neat and finished.

 The framework in place

 Plaka arranged for the top of the steps - but it was too late to fit it, and then we ran out of time, so it will have to wait now.

The steps will do as they are for now, as it's a big job to tie it all in to the house aesthetic, and guests are arriving soon.  We don't want it to be only partly done when there's a toddler and their paraphernalia around.

Deconstructing the old, constructing the new

6 - 9 September 2019

We are expecting our first toddler visit in a week, and are doing our best to pre-empt problems and remove hazards (of which there are many!).  Lots of rubbish has to be taken out, and the old terrace top needed dismantling and barrowing to the bonfire site.

 Dave does the careful unscrewing bit, then I broke up the remainder, which was too battered to release the screws.  

 This is one of our hazardous areas.  A big heap of wood for the new terrace, the evicted workbench, looking for a new home, and some old tables that are heaven for Carpenter bees, and have to be made into bug housing.

 Work continues on the structure of the raised terrace section.  The  crossways struts were unfortunately cut too short, without reference to the plan, so an extra strengthening section had to be built to hold the cantilever supports.  It made it very much stronger in the end, but rather more work.

Dave treats the cut ends for extra protection, even though the wood is supposed to be fully weather- and bug-proofed.

Beach Clean

2 Sept 2019

A friend of ours organised an end-of-August beach clean-up, so we went along with our gloves and bags and scoured Desimi beach for cigarette ends.  About twenty people showed up, which was impressive.