Monday 29 April 2019

Sparkly new floor

11 - 20 April 2019

Work proceeds rapidly in the music room, every day is a new excitement.  It is so wonderful to be walking around at the right height for the room, rather than in a hole 30cm down.  The proportions of the room have adjusted wonderfully, the windows are no longer too high.  We are very pleased with developments.

 Joists and nubbins (yes, really!)

 And the floorboards, at last, hurrah!

 Not easy to see here, but after a full day of sanding, the room is coated in dust, and the (previously invisible) spiderwebs are very evident.

 I do my bit base-coating the skirting boards.

 Rowan comes to fit the skirting boards, and because he's protecting the floor by working in his socks, I lay down some rugs (due for the wash, anyway) between the workbench and the door.

Taa-rah!
It's beautiful.