Wednesday, 28 June 2017

Back to work

22 - 28 June 2017

Lovely to see everyone, but also lovely to get stuck into moving the house along again, however slowly as the temperatures ramp up into the 30s.  Dave made a mix in the new mixer, and I stuffed some more straw clay into the top apertures, before Dave fixed boards to make it all neat.

Equipment all ready, sheet pinned up to stop plaster falling on the newly completed wall below

 Board on the right fitted, around the wire pipe

 While I got each section ready, Dave fixed boards elsewhere, this one over the music room door

 All three boards fitted, looking very smart

 Time to start the limewashing.  Three coats all round!